Overview
A practical guide to surveys, design, approvals, installation and handover for a typical solar PV project.
A typical timeline
Most domestic installations are completed in a small number of days once the survey, system design and approvals are in place. Roof type, scaffold access, system size and electrical upgrades can affect the programme.
What happens first?
We begin with an assessment of the property, energy needs and available roof space. From there, the system is designed, components are ordered and an installation date is agreed.